TERMS AND CONDITIONS (2014)
PACKING AND SHIPPING. Supplier must prepare/package product for CELCO to prevent shipping damage and deterioration.
SHIPMENT/DELIVERY. Shipments or deliveries, as specified in a CELCO Purchase Order, shall be in accordance with the
specified quantities and the specified schedules. Supplier is encouraged to notify CELCO of any anticipated or actual delay and the
actions being taken by Supplier to minimize delay.
CELCO FURNISHED MATERIALS. All materials furnished by CELCO are to be returned with the product upon completion of
the order unless other arrangements have been made.
SUBCONTRACTING/APPROVED SUPPLIERS. Any CELCO supplier may subcontract work to another supplier provided that
CELCO is provided with the same rights and protection as contained in the Right of Entry clause. Prior to subcontracting, CELCO
must be contacted for approval. Suppliers may only use approved suppliers of CELCO and its customers. All applicable
requirements in the Purchase Order must be flowed down to the sub-tier suppliers including key characteristics where required.
RIGHT OF ENTRY. Supplier shall allow CELCO representatives, CELCO customers, statutory and regulatory agencies right of
entry into the applicable areas of Supplier’s facilities and the entire supply chain to verify all processes and records.
QUALITY. Supplier shall provide and maintain an inspection system which will assure that all delivered products conform to
Purchase Order requirements, whether manufactured or processed by the supplier or a sub-tier supplier. Supplier shall maintain
controls and perform all inspections and tests required to substantiate product conformance to Purchase Order requirements. If not
specified in the Purchase Order, contact CELCO for required revision of drawings, specifications and other requirements. Supplier
is required to notify CELCO of changes in product and/or process definition to obtain CELCO’s approval prior to such changes.
INSPECTION AND TEST EQUIPMENT. Supplier shall maintain inspection and test equipment to assure calibration traceable to
a known national or international standard. Calibration records must be maintained and made accessible to CELCO, if required.
FOREIGN OBJECT DAMAGE. Supplier shall control/prevent foreign object damage or contamination during manufacture,
assembly, inspection and/or shipment. The FOD program requirements must be made accessible to CELCO upon request.
RECORDS. The Supplier shall maintain records of work performed for CELCO. Records shall include the certificate provided to
CELCO as well as records that support the certificate. Records must be maintained for a minimum of ten (10) years in any format.
NON-CONFORMING MATERIAL. Supplier must notify CELCO of any nonconforming product and make arrangements for
approval to submit nonconforming product.
CERTIFICATIONS. Supplier must ensure that individual parameters within a given specification have been met. Certifications
must reflect that all applicable manufacturing and process specifications called for on the engineering drawing have been met. If
the requirement for certification is other than a statement of conformance, it will be stated on the Purchase Order.
FIRST ARTICLE INSPECTION. If required by CELCO on the Purchase Order, first article inspections are to be recorded on
form AS9102, current revision. Any other format used must be compliant with AS9102 and approved by CELCO prior to use.
CALIBRATION SERVICES ONLY. Calibration of inspection equipment shall be performed traceable to National Institute of
Standards and Technology (NIST) or other national or international standards. Certificates of Calibration shall be provided with
each calibration.
CHANGES. Any change to the requirements as stated on the Purchase Order must be approved by CELCO prior to taking action
on those proposed changes.
***********************************************************************************************